U.S. Army orders bridges made of recycled plastic PDF  | Print |  E-mail
Monday, 16 November 2009 12:16
Axion signs $957,000 contract to build two bridges for Fort Eustis from a thermoplastic structural composite it developed with Rutgers University.

Originally posted at Planetary Gear



Full Story
 
Infrared Cameras